A sour gas reservoir in a foreign country (Jordan)

PROJECT SCENARIO
You have been selected by Oil Company to study an interesting prospect — a sour gas reservoir in a foreign country (Jordan). The host government is proposing two alternative methods to develop the
field (described below), with gas used in local power generation, but at present only limited data is available, primarily from one well test (currently waiting for the service company to provide
the data) and other reservoirs in the same country. You need to supplement existing data by making engineering estimates as required.
• Word documents about the following topics are attached:
a- Likely future product prices for gas and other products b- Decommissioning techniques and costs for facilities after abandonment c- Political and economic issues in Jordan d- What new technology
could be applied to improve recovery and/or economics • Try to link the information obtained in these reports to the project. • Carry out the following tasks: a- Estimate the reserves and
recoverable hydrocarbons for the reservoir. Attached is the Excel sheet for the data to be used. b- Make a development plan for the reservoir (number of wells, timing, production etc.). c- Develop
a cash flow model using Excel spreadsheets. d- Plan for the entire field to be decommissioned by plugging and abandoning wells and removing and scrapping all facilities or other more-economic
option. e- Compare the two development options proposed by the host government: i. A special service contract where the operating or service company handles all costs and is paid a fixed price per
unit of gas produced (with ownership of any oil or condensate produced being transferred to the host government). ii. A concession contract in which all costs are handled by the operator, products
are sold at market rates, and the government charges royalties and corporate tax. f- Estimate financial parameters which management could use to compare your project with others. g- Perform a risk
analysis, including sensitivity studies using the cash flow model you have built, and use of other techniques to be presented in classes. h- Write a report (minimum 2000 words) describing all the
work done above, and making recommendations as to which if any development option is worthy of more detailed evaluation. You must take into account the findings of the attached word documents. i-
You will notice that there is no information concerning where the reservoir is located physically, other than the country. As I said you are at liberty to develop the scenario, so effectively you
can chose whether it is offshore or onshore — but do make sure the whole team makes the same decision. Onshore will be cheaper, but you may find less information published about on-shore fields.
Also, international partners are typically involved in developing more challenging reservoirs, such as offshore ones.


Last Completed Projects

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min